Family-Owned & Operated in Jacksonville Since 2004
πŸ“ž Call (904) 619-6687

Local Knowledge

Two Things Decide a Ponte Vedra Repaint: The Board, and the Salt

In Ponte Vedra Beach the color you pick has to satisfy two parties: you, and an Architectural Review Board. Most of the deed-restricted and gated communities here run exterior color changes through an ARB, and a repaint that skips that step can turn into a violation letter, a hearing, and in the worst case a second paint job you pay for twice. We have been through the submittal process enough times to keep it boring. We brush out real samples on your own wall so you are judging the color in Ponte Vedra light rather than under a showroom bulb, list manufacturer and color codes for body, trim, and accent the way the board wants to see them, and we do not open a bucket until the written approval is in hand.

The second Ponte Vedra reality is corrosion, and it is unforgiving. Homes on and near Ponte Vedra Boulevard take a constant salt load off the ocean. You see it as rust bleeding through trim where a nail head has gone, aluminum window frames gone chalky and dull, hinges and screws seizing, and paint failing from the substrate outward instead of fading from the sun down. Painting over that only buys a season. We treat ferrous metal with rust-inhibitive primer, swap corroded fasteners for coated or stainless, cut out and replace trim that has gone soft, and specify a coating system rated for marine exposure. That is the difference between a finish that holds five or six years and one that fails in eighteen months.

The housing stock here also asks for range. In one week we might be on a stucco-and-cedar home behind the Plantation gates, an Old Ponte Vedra cottage that has been added onto three times since the fifties, and a newer Marsh Landing house where the real problem is second-story balcony railings and a screened pool cage rather than the walls. We would rather send a crew that has seen all three than one that only knows tract stucco.

Practically, expect a shorter repaint cycle here than a friend inland will quote you. Five to eight years is the honest Florida range, and oceanfront Ponte Vedra sits at the short end of it. Regular soft washing to knock the salt load off, and catching failed caulk joints early, is what stretches that number β€” which is exactly why we would rather maintain your house on a schedule than repaint it from scratch every four years.

Neighborhoods We Work In Around Ponte Vedra Beach

Sawgrass Marsh Landing Old Ponte Vedra The Plantation Sawgrass Country Club Ponte Vedra Boulevard Palm Valley

If your street is not on that list, it does not mean we do not work there β€” call (904) 619-6687 and ask.

What We Do in Ponte Vedra Beach

  • Exterior repaints with ARB-ready color submittals and brushed-out samples
  • Rust bleed, corroded fastener and metal-trim corrosion treatment
  • Wood rot and trim carpentry replaced before paint, not painted over
  • Roof, stucco and siding soft washing to strip the salt and algae load
  • Window cleaning including salt film, hard-water spots and pool-cage glass
  • Interior painting, and ongoing maintenance schedules for second homes
Wash, paint AND repair β€” one Ponte Vedra crew

We are the only local crew that does all three. Most companies here wash, or paint, or do carpentry. Because we do the whole set, the same visit that soft washes the salt off your walls also fixes the soft fascia the wash uncovered, repaints the trim, and leaves the glass clean. One schedule, one crew inside your gate, one invoice, one company on the hook if anything is not right.

Family-owned since 2004 and based on Hibiscus Street in Atlantic Beach, we are about twenty minutes up A1A β€” close enough to come back for a touch-up without making it a project. Fully licensed and insured with over $3,000,000 in coverage, and every job carries the HII Protection Warranty: if it is not right, we make it right.

What Homeowners Say

A Word From Our Clients

"I highly recommend this company. I refer them to my customers. Great family β€” always going over and beyond expectations."

β€” Renee Price
Family Owned Since 2004

Based on Hibiscus St in Atlantic Beach

Licensed & Insured

Over $3,000,000 in coverage for your protection

Wash, Paint & Repair

The only local crew that does all three

HII Protection Warranty

If it isn't right, we come back and make it right

Ponte Vedra Beach Questions

Ponte Vedra Beach Painting & Maintenance FAQ

Do you handle Architectural Review Board color approvals in Ponte Vedra Beach?

Yes. Most deed-restricted and gated communities in Ponte Vedra Beach require exterior color changes to go through an Architectural Review Board, and we prepare the submittal with you.

We brush out physical samples on your own wall so you judge the color in local light, document manufacturer names and color codes for body, trim, and accent the way the board expects, and wait for written approval before any work starts. If your ARB has a pre-approved palette, we work inside it and show you what those colors really look like on your elevation.

How long does exterior paint last on an oceanfront Ponte Vedra Beach home?

The honest Florida range is five to eight years, and oceanfront Ponte Vedra sits at the short end of it β€” constant salt spray, wind-driven rain, and UV break coatings down faster east of A1A than a few miles inland.

What actually stretches the interval is maintenance, not a more expensive can of paint: soft washing the salt and algae load off two or three times a year, re-caulking joints as soon as they open, and treating rust bleed the moment it shows instead of at the next repaint.

Can you fix the rust bleed and corroded trim on my Ponte Vedra home, or only paint it?

We fix it. We are a licensed general contractor and house painter, not a paint-only outfit, so corrosion and rot get repaired rather than coated over.

That means rust-inhibitive primer on ferrous metal, corroded fasteners replaced with coated or stainless hardware, soft trim and fascia cut out and replaced with new material, and open joints re-caulked before finish coats. Painting over active corrosion in a salt environment buys a season at most β€” we would rather say so during the estimate than field a callback in a year.