Family-Owned & Operated in Jacksonville Since 2004
๐Ÿ“ž Call (904) 619-6687

Overview

The Room Everyone Regrets Waiting On

A bathroom remodel in Jacksonville, FL is the single hardest project to live through and the easiest one to do in an empty house, which is why it anchors so many jobs in our move-in ready renovation service. Nobody is sharing a hall bath for three weeks. The tile saw can run at 8am. Demolition dust has nowhere to travel.

We handle master bathroom renovation from demolition to final caulk line: framing changes, waterproofing, tile, glass, vanities, mirrors, lighting and fixtures. Licensed plumbers pull the permits for anything behind the wall and handle their own inspections, so rough-in and finish plumbing are documented rather than improvised.

Scope

What a Bathroom Remodel in Jacksonville, FL Includes

Most of our bathrooms are full gut jobs. Where a homeowner wants something lighter, we will scope a partial โ€” new vanity, new toilet, refreshed tile and paint โ€” but in a house you just bought, doing it once and doing it completely is almost always the better spend.

  • โœ“ Full demolition, including old tub decks, cultured marble and builder tile
  • โœ“ New tile shower with proper waterproofing, niche, bench and glass
  • โœ“ Tub replacement โ€” freestanding soaker or drop-in, plumbed by licensed trades
  • โœ“ Vanity installation with quartz or stone tops, undermount sinks and mirrors
  • โœ“ Toilets, faucets, valves and exhaust fans replaced and vented correctly
  • โœ“ Recessed and vanity lighting, added circuits and GFCI protection
Get a Bathroom Scope and Price

Built for Florida

Waterproofing Is Not Optional Here

Northeast Florida humidity does not forgive a shortcut behind tile. We use a bonded waterproofing membrane over the pan and walls, not just backer board and thinset, and we slope pans correctly so water goes to the drain instead of sitting under the tile. Bathrooms near the ocean in Atlantic Beach and Ponte Vedra also get honest ventilation โ€” a fan that actually exhausts outside, sized for the room.

Material choices matter too. Porcelain over natural stone in a wet area near salt air, quality mixing valves rather than builder specials, and finishes that will not pit within two years of coastal humidity. If you have found bathroom contractors near me quoting well below everyone else, ask what is behind the tile.

Budget

Bathroom Renovation Cost in Jacksonville, Honestly

Bathroom renovation cost in Jacksonville varies more by selections than by labor. A full guest bath rebuild with stock tile and a stock vanity is a different number than a master with a curbless shower, slab-look porcelain and a custom vanity. We quote a fixed price with dollar allowances for tile, fixtures and countertops, so you can see exactly what an upgrade costs before you approve it.

A gut master bath typically needs two to three weeks on site once materials are in hand, which fits comfortably inside a normal closing-to-move-in window. Special-order glass and imported tile are the two items that most often force a schedule change, so we lock those first.

How It Works

How a Bathroom Fits the Move-In Deadline

Everything ordered before demolition starts.

1

Walkthrough and Layout

We measure, discuss layout changes and price the scope in writing.

2

Selections and Ordering

Tile, vanity, glass and fixtures ordered during your closing period.

3

Demolition and Rough Trades

Plumbing and electrical rough-in, inspected, then waterproofing.

4

Tile, Finish and Punch

Tile, glass, fixtures and paint โ€” done before the truck arrives.

One Point of Contact

The owner runs the schedule and answers the phone

Deadline-Driven Scheduling

Work planned backward from your move-in date

Licensed & Permitted Trades

Electrical and plumbing by licensed subcontractors

$3M+ Insurance Coverage

Family-owned and fully insured since 2004

Where We Work

Serving Jacksonville & Northeast Florida

Based in Atlantic Beach and working across the First Coast. Call (904) 619-6687 to confirm coverage in your area.

Jacksonville Atlantic Beach Neptune Beach Jacksonville Beach Ponte Vedra Beach Nocatee St. Johns St. Augustine Fernandina Beach Orange Park Fleming Island

Common Questions

Bathroom Remodeling Questions

How long does a master bathroom renovation take?

Two to three weeks on site for a full gut, provided tile, vanity and glass are already ordered. Shower glass is measured after tile is set, so the final week usually depends on the glass shop.

Can you move the shower or toilet?

Yes, within reason. Relocating a drain in a slab foundation means cutting and re-pouring concrete, which adds cost and permit time. We will tell you at the walkthrough whether a layout change is worth what it costs.

Do you replace the tub with a bigger shower?

Frequently. Converting a tub-and-deck to a large tile shower is one of the most requested changes in Jacksonville-area masters, and it is straightforward when the plumbing wall stays put.

Who handles plumbing permits?

Our licensed plumbers pull their own permits and manage inspections for rough-in and finish work. We schedule the build around inspection dates so tile never goes up over uninspected plumbing.

๐Ÿ“ž Call Now Free Estimate